Stability estimation method of greenschist tunnel based on increasing-decreasing energy method
|更新时间:2026-06-25
|
Stability estimation method of greenschist tunnel based on increasing-decreasing energy method
Vol. 33, Issue 2, (2012)
作者机构:
中国科学院武汉岩土力学研究所 岩土力学与工程国家重点实验室,武汉,430071
作者简介:
基金信息:
DOI:
CLC:TV554
Online First:14 February 2012,
Published:2012
稿件说明:
移动端阅览
SUN Feng, FENG Xia-ting, ZHANG Chuan-qing, et al. Stability estimation method of greenschist tunnel based on increasing-decreasing energy method[J]. 2012, 33(2).
DOI:
SUN Feng, FENG Xia-ting, ZHANG Chuan-qing, et al. Stability estimation method of greenschist tunnel based on increasing-decreasing energy method[J]. 2012, 33(2).DOI:
Stability estimation method of greenschist tunnel based on increasing-decreasing energy method
Based on the understanding of geological conditions
tunnel excavation response and the physico-mechanical properties from laboratory tests of rock
deformation gradation and safety factor of the soft rock tunnel are proposed. Considering that the root cause of tunnel instability after excavation is the excessive energy of the tunnel native rock; the energy
which is combined with the ratio of the total deformation and elastic deformation
is used to analyze the stability of the tunnel; and on the basis
the safety factor is obtained by increasing-decreasing energy of the original rock. Through the practical application and compared with traditional evaluation methods
the method metioned above is proved to be reasonable and practical. The geological conditions of surrounding rock
the cross section shape
size
excavation and other factors
which are rarely considered by traditional evaluation methods are taken into account
so as to supply important references for the underground engineering.