Study of post-construction settlement combination forecast method of high-speed railway bridge pile foundation
|更新时间:2026-06-25
|
Study of post-construction settlement combination forecast method of high-speed railway bridge pile foundation
Vol. 32, Issue 11, (2011)
作者机构:
中南大学 土木工程学院,长沙,410075
作者简介:
基金信息:
DOI:
CLC:TU432
Online First:09 November 2011,
Published:2011
稿件说明:
移动端阅览
LENG Wu-ming, YANG Qi, NIE Ru-song, et al. Study of post-construction settlement combination forecast method of high-speed railway bridge pile foundation[J]. 2011, 32(11).
DOI:
LENG Wu-ming, YANG Qi, NIE Ru-song, et al. Study of post-construction settlement combination forecast method of high-speed railway bridge pile foundation[J]. 2011, 32(11).DOI:
Study of post-construction settlement combination forecast method of high-speed railway bridge pile foundation
A large number of accurate and reliable settlement data were obtained via on-site long-term monitoring test. The basic settlement law of pile foundation and characteristics of settlement curve were studied. Single forecast model was used to fit the monitoring data. The inadequacy that the evaluation of reasonable prediction model was limited to the correlation coefficient index in current guidebook was pointed out. It was proposed that mean-square error
mean absolute percentage error and average absolute error were introduced to comprehensively examine
evaluate the fitting effect and the reference value corresponding to the evaluation index was recommended. Combination forecast model for high-speed railway bridge post-construction settlement prediction was proposed; the characteristics of existing combination prediction models were analyzed and compared; specific steps and basic principles of bridge pile foundation post-construction settlement forecast were brought forward; and corresponding computer program was developed to improve forecast accuracy and efficiency. It was found that
by engineering examples
the optimal combination forecast method based on least-squares criterion could be thought of as the favor model owing to effectively and comprehensively improving the prediction accuracy. The valuable supplement and reference were provided to confirm reasonable time to construct railway and calculate post-construction settlement.