Experimental study of key parameters of high piled foundation for offshore wind turbine
|更新时间:2026-06-25
|
Experimental study of key parameters of high piled foundation for offshore wind turbine
Vol. 32, Issue S2, (2011)
作者机构:
东南大学 土木学院,南京,210096
作者简介:
基金信息:
DOI:
CLC:TU473.1
Online First:26 August 2011,
Published:2011
稿件说明:
移动端阅览
GONG Wei-ming, HUANG Ting, DAI Guo-liang. Experimental study of key parameters of high piled foundation for offshore wind turbine[J]. 2011, 32(S2).
DOI:
GONG Wei-ming, HUANG Ting, DAI Guo-liang. Experimental study of key parameters of high piled foundation for offshore wind turbine[J]. 2011, 32(S2).DOI:
Experimental study of key parameters of high piled foundation for offshore wind turbine
In order to investigate the key parameters of high-piled foundation for Donghai Bridge offshore wind turbine
a series of field tests were conducted. The horizontal bearing capacity of offshore steel-pipe vertical pile and batter pile was achieved by the horizontal static load field test; and the vertical bearing capacity of pile was tested by the Osterberg method. The wave force on the steel-pipe pile which was connected and unconnected to the test platform was tested; and the acceleration versus time data and natural vibration frequency were obtained. The results show that the horizontal bearing capacity of the positive batter pile is better than that of the negative batter pile. When the pile is not connected to the test platform
the wave-induced displacement of pile is obviously greater than that of the pile connected to the test platform. The natural vibration frequency of steel-pipe pile is between 1.05 Hz and 1.3 Hz
among which the natural vibration frequency of batter pile is higher than that of vertical pile. The research results are applied to the design for high-piled foundation in this project.