Investigation on stress variation in soil surrounding a soil nail during installation and pull-out
|更新时间:2026-06-25
|
Investigation on stress variation in soil surrounding a soil nail during installation and pull-out
Vol. 32, Issue S1, (2011)
作者机构:
1. 西安建筑科技大学 土木工程学院,西安,710055
2. 西安交通大学 土木工程系,西安,710049
3. 香港理工大学 土木工程系,香港
作者简介:
基金信息:
DOI:
CLC:TU411
Online First:16 May 2011,
Published:2011
稿件说明:
移动端阅览
SU Li-jun, LIAO Hong-jian, YIN Jian-hua. Investigation on stress variation in soil surrounding a soil nail during installation and pull-out[J]. 2011, 32(S1).
DOI:
SU Li-jun, LIAO Hong-jian, YIN Jian-hua. Investigation on stress variation in soil surrounding a soil nail during installation and pull-out[J]. 2011, 32(S1).DOI:
Investigation on stress variation in soil surrounding a soil nail during installation and pull-out
Pull-out strength of a soil nail is an important parameter in the design of a soil nailing system. The pull-out strength is determined by the normal stress acting on the soil nail surface during pull-out. The variation of normal stress in soil surrounding a drill-and-grout soil nail during drilling
grouting and pull-out is studied through both laboratory pull-out tests and numerical simulation. It is found that for a drill-and-grout soil nail
most of the normal stress in the soil surrounding the hole is released after drilling. For a soil nail grouted under low pressure
the normal stress does not substantially recover after the nail is installed. During pull-out
the normal stress acting on the nail increases with the increase in pull-out distance because of the constrained dilatancy of the soil surrounding the nail
which eventually increases the pull-out resistance. It is indicated that the dilatancy of the soil is very important to a drill-and-grout soil nail. For soils with low dilatancy
further measures
such as high pressure grouting should be employed to compensate the released stress during drilling.