您当前的位置:
首页 >
文章列表页 >
Optimization of bolt-grouting time for soft rock roadway
更新时间:2026-06-25
    • Optimization of bolt-grouting time for soft rock roadway

    • Vol. 33, Issue 5, (2012)
    • CLC: TD311
    • Online First:14 May 2012,

      Published:2012

    移动端阅览

  • LU Yin-long, WANG Lian-guo, ZHANG Bei, et al. Optimization of bolt-grouting time for soft rock roadway[J]. 2012, 33(5). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1994

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Numerical simulation for direct shear tests with strain softening constitutive contact elements
Roof and support and bottom yielding support with whole section and O-shape control principle for soft rock roadway and engineering practice
Application of optimized deformation consistence condition to anchor cable tensile force calculation of pile-anchor cable structure
Stability analysis of roadway intersection considering strain softening
Application of strain softening model to tunnels based on Hoek-Brown strength criterion

Related Author

ZHENG Li-ning
KANG Jing-wen
XIE Qiang
CHEN Yun
LI Ke-yi
JIA Peng
GAO Ming-shi
ZHAO Yi-chao

Related Institution

China Construction Underground Space Co., Ltd.
China Southwest Geotechnical Investigation & Design Institute Co., Ltd.
School of Geosciences and Environmental Engineering, Southwest Jiaotong University
Key Laboratory of Deep Coal Resource Mining, Ministry of Education, School of Mines, China University of Mining and Technology
Yongcheng Coal & Electricity Holding Group Co., Ltd., Yongcheng
0