您当前的位置:
首页 >
文章列表页 >
Settlement calculation of new prestressed pipe-pile with rib based on Geddes’ formula
更新时间:2026-06-25
    • Settlement calculation of new prestressed pipe-pile with rib based on Geddes’ formula

    • Vol. 32, Issue 12, (2011)
    • CLC: TU473
    • Online First:13 December 2011,

      Published:2011

    移动端阅览

  • XIONG Hou-ren, NIU Zhi-rong, JIANG Yuan-hai, et al. Settlement calculation of new prestressed pipe-pile with rib based on Geddes’ formula[J]. 2011, 32(12). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1713

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Composite ground settlement calculating method with displacement non-compatibility between deep mixing columns and surrounding soil
Analysis of one-dimensional consolidation characteristics in unsaturated soils
Analytical solution for settlement of group piles in layered ground based on shear displacement method
An analytical solution for displacement and stress caused by shallow buried tunnel excavation under existing highway foundation
Research on subgrade deformation of powdery soil in alluvial plain of Yellow River

Related Author

ZHENG Xiao-guo
XIE Wei
ZHANG Ding-wen
SUN De-an
TAN Yong-wei
Qiang –rui
QIN Ai-fang
JI Yu-jun

Related Institution

School of Transportation, Southeast University
School of Road and Bridge, Zhejiang Institute of Communications
Department of Civil Engineering, Shanghai University
Department of Geotechnical Engineering, Tongji University
Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University
0