Elastoplastic solution for deep tunnel considering influences of groundwater, grouting and lining
|更新时间:2026-06-25
|
Elastoplastic solution for deep tunnel considering influences of groundwater, grouting and lining
Vol. 33, Issue 3, (2012)
作者机构:
1. 中铁二局股份有限公司,成都,610031
2. 同济大学 岩土及地下工程教育部重点实验室,上海,200092
作者简介:
基金信息:
DOI:
CLC:TV554
Online First:12 March 2012,
Published:2012
稿件说明:
移动端阅览
HU Li-sheng, WANG Jian-xiu, LU Yao-ru. Elastoplastic solution for deep tunnel considering influences of groundwater, grouting and lining[J]. 2012, 33(3).
DOI:
HU Li-sheng, WANG Jian-xiu, LU Yao-ru. Elastoplastic solution for deep tunnel considering influences of groundwater, grouting and lining[J]. 2012, 33(3).DOI:
Elastoplastic solution for deep tunnel considering influences of groundwater, grouting and lining
The water pressure equilibrium system of deep tunnel is composed of groundwater
surrounding rock
grouting ring and lining
which can not be systematically investigated by the traditional methods for the stress and plastic zone of tunnel. The elastoplastic solution for deep tunnel is carried out. The surrounding rock
grouting ring and lining are assumed as isotropic continuous elastoplastic medium. Based on the elastoplastic mechanics
groundwater hydraulics theory and Mohr-Coulomb criterion
the calculation formulas for stress and plastic zone of axisymmetric deep tunnel under the combined action of four factors are deduced. To calculate a deep tunnel
Matlab is adopted to edit routine for the computation. Compared with the calculated results obtained from the traditional solutions
the correctness of deduced formulas is validated; and the defects of traditional methods are indicated. The influence of grouting parameters on plastic zone and the method for deciding optimum thickness of grouting ring are also discussed.