Hollow cylinder samples tests were performed with high-density saturated silt from the sea entrance of the Yangtze River. The stress paths consisted of undrained cyclic principal stress rotation at the range of 180° with different shear stress ratio and frequency. It is found that isotropic consolidated samples would liquefy after cyclic principal stress axis rotation
which is featured by the excess pore water pressure reached initial effective confining pressure. Before the liquefaction
due to the different shear stress levels the development of pore water pressure was divided into three stages by graded phase transformation point and cataclysmic phase transformation point or two stages by cataclysmic phase transformation point. As for the development of strain components
it was divided into two stages by collapse point. Meanwhile the cataclysmic phase transformation point of pore water pressure and the collapse point of strain occurred simultaneously
which reflected the state of structure collapse. Besides the deviator strains when the collapse state occured were limited within a narrow range of 0.2%-0.4%. The stress state of collapse can be normalized in - space with a line when samples underwent cyclic principal stress axis rotation after isotropic consolidation. Furthermore the development of pore water pressure can be fitted well by modified Seed model in which the collapse state was used as the normalized denominator.
Strength characteristics of isotropically consolidated silt under change of principal stress orientation and correlative evaluation method with collapse energy
Test study on influence of fine particle content on dynamic pore water pressure development mode of silt
Influence of long-term partial drainage of shield tunnel on tunnel deformation and surface settlement
Collapse characteristics and unified pore water pressure model of slightly- anisotropically consolidated dense silt under principal stress axis rotation
Experimental research on ground improvement of silt using impact roller compaction
Related Author
ZHANG Peng-ju
FEI Zhong-qiu
ZENG Chang-nü
LIU Han-long
CHEN Yu-ming
LIU Yin
ZHANG Dong-mei
HUANG Hong-wei
Related Institution
Institute of Geotechnical Engineering, Hohai University
Department of Civil and Architecture, Henan University of techonology
Department of Geotechnical Engineering, Tongji University
Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University