您当前的位置:
首页 >
文章列表页 >
Optimization analysis of group piles below rigid raft with a cut-off method
更新时间:2026-06-25
    • Optimization analysis of group piles below rigid raft with a cut-off method

    • Vol. 32, Issue S1, (2011)
    • CLC: TU473
    • Online First:16 May 2011,

      Published:2011

    移动端阅览

  • LIANG Fa-yun, CHEN Hai-bing. Optimization analysis of group piles below rigid raft with a cut-off method[J]. 2011, 32(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1666

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of dynamic response of shield tunnel to explosion seismic wave
An elastoplastic analytical solution for circular cavern considering combined thermo-hydro-mechanical action
Estimate method of dislocation to seismic surface rupture under strike-slip fault
Three dimensional elastoplastic consolidation analysis of water-injecting well backwash
ALE method finite element analysis of elastoplastic soil slope

Related Author

LIU Yang
WANG Ming-yang
LI Jie
WANG De-rong
ZHANG Ning
ZHANG Yu-jun
ZHANG Wei-qing
ZHAO Ying

Related Institution

School of Mechanical Engineering, Nanjing University of Science and Technology
State Key Laboratory of Disaster Prevention & Mitigation of Explosion & Impact, PLA University of Science and Technology
China Railway Tunnel Survey & Design Institute Co., Ltd.
State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
Engineering College, Harbin University
0