In order to study the behaviors of uplift pile subject to cyclic load
cyclic loading tests are carried out on two uplift piles at Xiaoshan
Hangzhou. Stress gauges and steel pipes are pre-buried in the test pile to measure the changes of pile shaft stress and the pull-out amount of both pile tip and pile head. Through the analysis of the pile shaft stress and the pull-out amount
the influence of cyclic load on bearing capacity and pull-out amount are studied. Comprehensive analysis of the pull-out amount
pile shaft force and pile side friction
it is drawn a conclusion that the uplift pile damaged after two or three cycles when uplift pile subjects to cyclic load