您当前的位置:
首页 >
文章列表页 >
Simplified calculation methods of post-construction settlement of high-fill foundation in mountain airport
更新时间:2026-06-25
    • Simplified calculation methods of post-construction settlement of high-fill foundation in mountain airport

    • Vol. 32, Issue S1, (2011)
    • CLC: TU411
    • Online First:16 May 2011,

      Published:2011

    移动端阅览

  • CAO Guang-xu, SONG Er-xiang, XU Ming. Simplified calculation methods of post-construction settlement of high-fill foundation in mountain airport[J]. 2011, 32(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2483

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Centrifugal model test of pile-plank subgrade in soft ground
Behaviors of existing salt cavern group used for underground energy storage
Study of nonlinear rheological model of Nanning expansive soils
Study of post-construction settlement combination forecast method of high-speed railway bridge pile foundation
Experimental study of creep deformation of saturated clay

Related Author

ZHOU Shun-hua
WANG Bing-long
HUANG Long
SHI Xi-lin
YAO Yuan-feng
YANG Chun-he
JI Wen-dong
LI Zhen-yu

Related Institution

Key Laboratory of Road and Traffic Engineering of Ministry of Education, Tongji University
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
College of Civil Engineering, Hunan University of Technology
School of Civil Engineering and Mechanics, Central South University of Forestry and Technology
School of Civil Engineering, Central South University
0