您当前的位置:
首页 >
文章列表页 >
Monitoring and numerical simulation of deformation of retaining structure in subway station foundation pit
更新时间:2026-06-25
    • Monitoring and numerical simulation of deformation of retaining structure in subway station foundation pit

    • Vol. 31, Issue S2, (2010)
    • CLC: TU473
    • Online First:12 January 2011,

      Published:2010

    移动端阅览

  • LIU Jie, YAO Hai-lin, REN Jian-xi. Monitoring and numerical simulation of deformation of retaining structure in subway station foundation pit[J]. 2010, 31(S2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

3704

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Seismic response and damage characteristics of subway stations in inclined liquefiable sites
Finite element simulation of permeable pipe pile driving considering consolidation process
Analysis of stress path and deformation-failure mechanism of high cutting loess slope
Study of time effect on top-down excavation of Shanghai Zhongshan Hospital
Analysis of damage causes of a metro station passageway

Related Author

ZHANG Xi-wen
JIANG Xiao-tong
LÜ Ying-hui
QIU Yu
LIU Fu-zhen
ZHOU Xiao-peng
MEI Guo-xiong
HOU Xiao-kun

Related Institution

School of Civil Engineering and Architecture, University of Jinan
College of Transportation Engineering, Nanjing University of Technology
China Resources Land (Ningbo) Co., Ltd.
School of Geological Engineering and Surveying, Chang’an University
Key Laboratory for Geo-hazards in Loess Area of Ministry of Land and Resources, Xi’an Center of Geological Survey, China Geological Survey
0