您当前的位置:
首页 >
文章列表页 >
Complicated loading device for pile foundation of wind-driven generator in centrifugal field
更新时间:2026-06-25
    • Complicated loading device for pile foundation of wind-driven generator in centrifugal field

    • Vol. 32, Issue 5, (2011)
    • CLC: TU473.1
    • Online First:23 September 2011,

      Published:2011

    移动端阅览

  • RONG Bing, ZHANG Ga, WANG Fu-qiang. Complicated loading device for pile foundation of wind-driven generator in centrifugal field[J]. 2011, 32(5). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1631

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study of new type of Daubechies wavelet connection coefficient used in computation of pile foundations
Centrifuge modeling of geotextile-reinforced cohesive soil slopes under surface loading
Development of centrifuge model test facility of retaining wall
Test study and numerical analysis of seismic response of pile foundation of bridge at permafrost regions along Qinghai-Tibet Railroad
Experimental study on shear characteristics of mudstone under combined action of stress-dry-wet cycles

Related Author

CHEN Ya-qin
ZHANG Hong-guang
DANG Fa-ning
HU Yun
ZHANG Ga
LIU Wen-xing
LEE C F
SONG Fei

Related Institution

School of Highway, Chang’an University
Institute of Geotechnical Engineering, Xi’an University of Technology
State Key Laboratory of Hydroscience and Engineering, Tsinghua University
State Key Lab of Hydrosciences and Engineering, Tsinghua University
School of Highway Engineering, Chang’an University
0