您当前的位置:
首页 >
文章列表页 >
Influence of metro station construction by drift-pile-beam-arch method on soil and rigid-joint pipeline
更新时间:2026-06-25
    • Influence of metro station construction by drift-pile-beam-arch method on soil and rigid-joint pipeline

    • Vol. 32, Issue 8, (2011)
    • CLC: U215.7
    • Online First:16 August 2011,

      Published:2011

    移动端阅览

  • WANG Ting, LUO Fu-rong, LIU Wei-ning, et al. Influence of metro station construction by drift-pile-beam-arch method on soil and rigid-joint pipeline[J]. 2011, 32(8). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1385

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of raising pipeline by fracture grouting and its application
Displacement superposition method of numerical analysis for determining influence of complex metro station construction on deformation of adjacent buildings
Experimental study of pore pressure model of soft clay with different consolidation degrees under subway loading
Research on calculation of post-construction transverse surface settlement caused by shield tunneling
Deformation characteristic analysis of foundation pit under asymmetric excavation condition

Related Author

SUN Feng
ZHANG Ding-li
WANG Chen
FANG Qian1
LI Bing
CHEN Cheng
YAN Qin
LIU Lin-jun

Related Institution

Beijing Urban Engineering Design & Research Institute Co., Ltd.
Tunnel and Underground Engineering Research Center of Ministry of Education, Beijing Jiaotong University
Anhui Institute of Building Research & Design
Research Center of Geotechnical and Structural Engineering,Shandong University
College of Civil Engineering and Architecture, Zhejiang University
0