Study of construction section comprehensive load releasing process of ultra-large section railway tunnel
|更新时间:2026-06-25
|
Study of construction section comprehensive load releasing process of ultra-large section railway tunnel
Vol. 32, Issue 9, (2011)
作者机构:
1. 山东大学 岩土与结构工程研究中心,济南,250061
2. 青岛市地下铁道公司,山东,青岛,266071
作者简介:
基金信息:
DOI:
CLC:TU443
Online First:13 September 2011,
Published:2011
稿件说明:
移动端阅览
LI Shu-cai, ZHAO Yan, LI Li-ping, et al. Study of construction section comprehensive load releasing process of ultra-large section railway tunnel[J]. 2011, 32(9).
DOI:
LI Shu-cai, ZHAO Yan, LI Li-ping, et al. Study of construction section comprehensive load releasing process of ultra-large section railway tunnel[J]. 2011, 32(9).DOI:
Study of construction section comprehensive load releasing process of ultra-large section railway tunnel
Tunnel excavation will lead to surrounding rock loose and exert certain load on the structure in the meantime. In the excavation process
the load of structure releases continuously in the stress adjustment process till the structure and rock mass stabilizing. Numerical analysis and model test are carried out to research the load releasing process of the whole section in the construction of ultra-large section railway tunnel. The load fluctuation rules of key points in bench excavation are studied firstly
then concepts of section comprehensive load release rate and difference coefficient of load release that characterizes the state of load release of the whole section are defined; and the load fluctuation rules in the process of construction are summarized via the two parameters. With monitoring of change laws of radial pressure at key points of rock mass in the geomechanical model test
the conclusions obtained by numerical analysis are testified; and the principle that the section must be regarded as a whole is realized to make the study of load release more comprehensive.