您当前的位置:
首页 >
文章列表页 >
Study of dam deformation control method for Shuibuya high concrete faced rockfill dam
更新时间:2026-06-25
    • Study of dam deformation control method for Shuibuya high concrete faced rockfill dam

    • Vol. 31, Issue S2, (2010)
    • CLC: TU64+1
    • Online First:12 January 2011,

      Published:2010

    移动端阅览

  • YANG Qi-gui, CHANG Xiao-lin, ZHOU Chuang-bing, et al. Study of dam deformation control method for Shuibuya high concrete faced rockfill dam[J]. 2010, 31(S2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2680

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Three dimension FEM numerical simulating of the rockfill creep of high concrete face rockfill dam
Three dimension FEM numerical simulating of the rockfill creep of high concrete face rockfill dam
A study of optimal construction scheme of high concrete face rockfill dam in consideration of rockfill creep effect
Study of creep convergence mechanism of high concrete face rockfill dam with consideration of rockfill arch action
Study of blasting vibration and deformation control for metro construction beneath existing metro tunnel in short distance

Related Author

ZHOU Wei
CHANG Xiao-lin
ZHOU Wei
CHANG Xiao-lin
HU Ying
YAN Sun-cun
HU Ying
YAN Sun-cun

Related Institution

State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University
武汉大学 水利水电学院 水资源与水电工程科学国家重点实验室
Hubei Qingjiang River Hydropower Development Company Ltd
Hubei Qingjiang River Hydropower Development Company Ltd.
Research Center of Geotechnical & Structural Engineering, Shandong University
0