Research on construction time of secondary lining of large section loess tunnel for high-speed railway
|更新时间:2026-06-25
|
Research on construction time of secondary lining of large section loess tunnel for high-speed railway
Vol. 32, Issue 3, (2011)
作者机构:
1. 成都理工大学 地质灾害防治与地质环境保护国家重点实验室,成都,610059
2. 西南交通大学 土木工程学院,成都,610031
3. 西华大学 建筑与土木工程学院,成都,610039
4. 中铁二院工程集团有限责任公司,成都,610031
5. 北京交通大学 土木建筑工程学院,北京,100044
作者简介:
基金信息:
DOI:
CLC:U45
Online First:21 March 2011,
Published:2011
稿件说明:
移动端阅览
LU Jun-fu, WANG Ming-nian, JIA Yuan-yuan, et al. Research on construction time of secondary lining of large section loess tunnel for high-speed railway[J]. 2011, 32(3).
DOI:
LU Jun-fu, WANG Ming-nian, JIA Yuan-yuan, et al. Research on construction time of secondary lining of large section loess tunnel for high-speed railway[J]. 2011, 32(3).DOI:
Research on construction time of secondary lining of large section loess tunnel for high-speed railway