Study of construction mechanical behavior of parallel-small spacing metro tunnels excavated by shield method and cross diaphragm (CRD) method in loess region
|更新时间:2026-06-25
|
Study of construction mechanical behavior of parallel-small spacing metro tunnels excavated by shield method and cross diaphragm (CRD) method in loess region
Vol. 32, Issue 2, (2011)
作者机构:
1. 同济大学 地下建筑与工程系,上海,200092
2. 同济大学 岩土及地下工程教育部重点实验室,上海,200092
3. 中交第一公路勘察设计研究院,西安,710075
4. 武汉科技大学 城市建设学院,武汉,430070
作者简介:
基金信息:
DOI:
CLC:U45
Online First:16 February 2011,
Published:2011
稿件说明:
移动端阅览
KONG Xiang-xing, XIA Cai-chu, QIU Yu-liang, et al. Study of construction mechanical behavior of parallel-small spacing metro tunnels excavated by shield method and cross diaphragm (CRD) method in loess region[J]. 2011, 32(2).
DOI:
KONG Xiang-xing, XIA Cai-chu, QIU Yu-liang, et al. Study of construction mechanical behavior of parallel-small spacing metro tunnels excavated by shield method and cross diaphragm (CRD) method in loess region[J]. 2011, 32(2).DOI:
Study of construction mechanical behavior of parallel-small spacing metro tunnels excavated by shield method and cross diaphragm (CRD) method in loess region