Stress monitoring and analysis of gravelly soil corewall in high rockfill dam during construction
|更新时间:2026-06-25
|
Stress monitoring and analysis of gravelly soil corewall in high rockfill dam during construction
Vol. 32, Issue 4, (2011)
作者机构:
四川大学 水力学与山区河流开发保护国家重点实验室,成都,610065
作者简介:
基金信息:
DOI:
CLC:TV641.4
Online First:29 April 2011,
Published:2011
稿件说明:
移动端阅览
CHEN Xiang-hao, DENG Jian-hui, CHEN Ke-wen, et al. Stress monitoring and analysis of gravelly soil corewall in high rockfill dam during construction[J]. 2011, 32(4).
DOI:
CHEN Xiang-hao, DENG Jian-hui, CHEN Ke-wen, et al. Stress monitoring and analysis of gravelly soil corewall in high rockfill dam during construction[J]. 2011, 32(4).DOI:
Stress monitoring and analysis of gravelly soil corewall in high rockfill dam during construction