您当前的位置:
首页 >
文章列表页 >
Stress monitoring and analysis of gravelly soil corewall in high rockfill dam during construction
更新时间:2026-06-25
    • Stress monitoring and analysis of gravelly soil corewall in high rockfill dam during construction

    • Vol. 32, Issue 4, (2011)
    • CLC: TV641.4
    • Online First:29 April 2011,

      Published:2011

    移动端阅览

  • CHEN Xiang-hao, DENG Jian-hui, CHEN Ke-wen, et al. Stress monitoring and analysis of gravelly soil corewall in high rockfill dam during construction[J]. 2011, 32(4). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

3292

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Field testing study on stresses of dry jet mixing combined with geogrids
Model experiment and numerical simulation of the instability of a dry red mud storage yard dam caused by water level changes
Numerical simulation and layerwise mark monitoring of land subsidence and ground fissures of typical section in Xi’an
Experimental study of foundation treatment with vacuum well-point dewatering
Physical model test research on anti-sliding characteristics of rock-socketed pile

Related Author

LIU Jun-xing
XIE Qiang
WEN Jiang-quan
QIU An-xi
CHANG Shi-qi
DONG Xiao-qiang
LIU Xiao-feng
LI Jiang-shan

Related Institution

School of Civil Engineering, Southwest Jiaotong University
College of Civil Engineering, Taiyuan University of Technology
Shanxi Key Laboratory of Civil Engineering Disaster Prevention and Control, Taiyuan University of Technology
State Key Laboratory of Geomechanics and Geotechnical Engineering Safety, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
The 1st Engineering Corporation Limited, China Railway Urban Construction Group
0