Determination of minimum thickness of overburden layer for shield tunnel through Qiantang River
|更新时间:2026-06-25
|
Determination of minimum thickness of overburden layer for shield tunnel through Qiantang River
Vol. 32, Issue 1, (2011)
作者机构:
1. 杭州市地铁集团有限责任公司,杭州,310003
2. 河海大学 土木与交通学院,南京,210098
作者简介:
基金信息:
DOI:
CLC:U451
Online First:19 January 2011,
Published:2011
稿件说明:
移动端阅览
SHEN Lin-chong, ZHONG Xiao-chun, QIN Jian-she, et al. Determination of minimum thickness of overburden layer for shield tunnel through Qiantang River[J]. 2011, 32(1).
DOI:
SHEN Lin-chong, ZHONG Xiao-chun, QIN Jian-she, et al. Determination of minimum thickness of overburden layer for shield tunnel through Qiantang River[J]. 2011, 32(1).DOI:
Determination of minimum thickness of overburden layer for shield tunnel through Qiantang River