您当前的位置:
首页 >
文章列表页 >
Study of face stability of cobble-soil shield tunnelling at Chengdu metro
更新时间:2026-06-25
    • Study of face stability of cobble-soil shield tunnelling at Chengdu metro

    • Vol. 32, Issue 1, (2011)
    • CLC: U451+.2
    • Online First:19 January 2011,

      Published:2011

    移动端阅览

  • WANG Ming-nian, WEI Long-hai, LU Jun-fu, et al. Study of face stability of cobble-soil shield tunnelling at Chengdu metro[J]. 2011, 32(1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

3793

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Stability of shield tunnel excavation face under seismic action based on upper bound theorem of limit analysis
Intelligent geological condition recognition in shield tunneling via time-series clustering and online learning
Shield-soil interaction model and numerical solution methodology considering active articulation system
Preliminary study on creep characteristics and model of sandstone under attenuated oscillation disturbance
Deformation effect on existing tunnels overlapped by new tunnel in lower-region

Related Author

ZHANG Zhi-guo
LUO Jie
ZHU Zheng-guo
PAN Y T
SUN Miao-miao
ZHEN Jia-jie
LAI Feng-wen
HUANG Ming

Related Institution

School of Environment and Architecture, University of Shanghai for Science and Technology
State Key Laboratory of Mechanical Behavior and System Safety of Traffic Engineering Structures, Shijiazhuang Tiedao University
Department of Civil and Environmental Engineering, National University of Singapore
Department of Civil Engineering, Hangzhou City University
Zhejiang Engineering Research Center of Intelligent Urban Infrastructure, Hangzhou City University
0