您当前的位置:
首页 >
文章列表页 >
Time series-projection pursuit regression model for predicting surface settlement during pit excavation
更新时间:2026-06-25
    • Time series-projection pursuit regression model for predicting surface settlement during pit excavation

    • Vol. 32, Issue 2, (2011)
    • CLC: TU463
    • Online First:16 February 2011,

      Published:2011

    移动端阅览

  • YIN Sheng-bin, DING Hong-yan. Time series-projection pursuit regression model for predicting surface settlement during pit excavation[J]. 2011, 32(2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

4261

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on calculation of post-construction transverse surface settlement caused by shield tunneling
Deformation characteristic analysis of foundation pit under asymmetric excavation condition
Analysis of surface settlement induced by some factors in parallel dual-tunnel construction
Meso-macro analysis of surface settlement characteristics during shield tunneling in sandy cobble ground
Analysis of surface settlement estimation of deep foundation pit excavation in soft soil

Related Author

ZHANG Shi-min
LIN Lei-lei
WEI Gang
YANG Ze-fei
LUO Zhi-yuan
CAI Yuan-qiang
CHENG Shou-ze
XU Chang-jie

Related Institution

Department of Civil Engineering, Zhejiang University City College
Jingrui Real Estate Group Co., Ltd.
Fujian Academy of Building Research
Key Laboratory of Soft Soils and Geoenvironmental Engineering of Ministry of Education, Zhejiang University
Research Center of Coastal and Urban Geotechnical Engineering, Zhejiang University
0