您当前的位置:
首页 >
文章列表页 >
Calculation method of digging length in underpass with underground excavation under shallow cover
更新时间:2026-06-25
    • Calculation method of digging length in underpass with underground excavation under shallow cover

    • Vol. 31, Issue 8, (2010)
    • CLC: TU924
    • Online First:30 August 2010,

      Published:2010

    移动端阅览

  • WANG Zhi-da, GONG Xiao-nan. Calculation method of digging length in underpass with underground excavation under shallow cover[J]. 2010, 31(8). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2776

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on calculation method of digging length in tunnel with underground excavation under shallow cover
Elasto-viscoplastic bounding surface model for unsaturated time-dependent soils incorporating non-stationary flow rule
Engineering characteristics of xanthan gum improved sandy slope soil and slope ecological protection mechanism
Investigation on thickness selection method of sealing steel plate for CAES gas storage caverns
Optimal design of lining structure in artificial cavern of compressed air energy storage

Related Author

WANG Zhi-da
GONG Xiao-nan
CAI Zhi-jun

Related Institution

Institute of Geotechnical Engineering, Zhejiang University
Project Management Division Under Jinduicheng Molybdenum Group Co. Ltd., Hua County
0