您当前的位置:
首页 >
文章列表页 >
Back analysis of elastic parameters and stability evaluation of Ming Tombs Reservoir dam
更新时间:2026-06-25
    • Back analysis of elastic parameters and stability evaluation of Ming Tombs Reservoir dam

    • Vol. 31, Issue 5, (2010)
    • CLC: 奥运建筑荷载
    • Online First:24 May 2010,

      Published:2010

    移动端阅览

  • WANG Zhi-yin, YUAN Hong-hu, ZHANG Qi-wei, et al. Back analysis of elastic parameters and stability evaluation of Ming Tombs Reservoir dam[J]. 2010, 31(5). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2308

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on progressive failure for slope using dynamic strength reduction method
Back analysis of initial geostress field of dam site in west route of South-to-North water transfer project
Geological cause and stability evaluation of Moluocun landslide, Danba county
Settlement calculation of pile foundation in deep-soft soil considering depth effect of compression modulus
Fuzzy evaluation method of slope stability based on uncertain analytic hierarchy process

Related Author

CHEN Guo-qing
HUANG Run-qiu
ZHOU Hui
XU Qiang
LI Tian-bin
PEI Qi-tao
LI Hai-bo
LIU Ya-qun

Related Institution

State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology
Chengdu Hydropower Investigation and Design Institute, CHECC
State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University
School of Civil Engineering, Southwest Jiaotong University
0