Design parameters of Xi’an metro line 2 tunnel passing through active ground fissure zones
|更新时间:2026-06-25
|
Design parameters of Xi’an metro line 2 tunnel passing through active ground fissure zones
Vol. 31, Issue 9, (2010)
作者机构:
作者简介:
基金信息:
DOI:
CLC:U452
Online First:16 September 2010,
Published:2010
稿件说明:
移动端阅览
HUANG Qiang-bing, PENG Jian-bing, DENG Ya-hong, et al. Design parameters of Xi’an metro line 2 tunnel passing through active ground fissure zones[J]. 2010, 31(9).
DOI:
HUANG Qiang-bing, PENG Jian-bing, DENG Ya-hong, et al. Design parameters of Xi’an metro line 2 tunnel passing through active ground fissure zones[J]. 2010, 31(9).DOI:
Design parameters of Xi’an metro line 2 tunnel passing through active ground fissure zones