您当前的位置:
首页 >
文章列表页 >
Analysis of stress and deformation of Jinping I High Arch Dam after foundation reinforcement
更新时间:2026-06-25
    • Analysis of stress and deformation of Jinping I High Arch Dam after foundation reinforcement

    • Vol. 31, Issue 9, (2010)
    • CLC: TB115
    • Online First:16 September 2010,

      Published:2010

    移动端阅览

  • HU Zhu-xiu, ZHANG Jian-hai, ZHOU Zhong, et al. Analysis of stress and deformation of Jinping I High Arch Dam after foundation reinforcement[J]. 2010, 31(9). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2759

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

三峡船闸及高边坡非线性大变形数值分析 附视频
Numerical simulation of tunnel excavation considering fluid solid coupling
Study of influence of shield tunneling on neighboring loaded piles
Analysis of anti-sliding stability in deep foundation of gravity dam based on partial coefficient
Development of software SASMD for determination of tunneling-induced ground surface movements

Related Author

3.200092
2.同济大学地下系!上海
1.淮南工业学院土木系!232001
孙钧
程桦
CHENG Lin-song
LIU Jian-jun
JI You-jun

Related Institution

School of Civil Engineering and Architecture, Southwest Petroleum University
Key Laboratory of Petroleum Engineering of Ministry of Education, China University of Petroleum
College of Civil Engineering, Suzhou University of Science and Technology
College of Civil Engineering, Nanjing Forestry University
Oriental Industries Co., Ltd.
0