您当前的位置:
首页 >
文章列表页 >
Breakage probability assessment of TBM construction tunnel lining segments considering geologic uncertainty
更新时间:2026-06-25
    • Breakage probability assessment of TBM construction tunnel lining segments considering geologic uncertainty

    • Vol. 31, Issue 4, (2010)
    • Online First:30 April 2010,

      Published:2010

    移动端阅览

  • LIU Dong-hai, HUANG Pei-zhi, FENG Shou-zhong. Breakage probability assessment of TBM construction tunnel lining segments considering geologic uncertainty[J]. 2010, 31(4). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2740

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

A review of the application of artificial intelligence in underground engineering for compressed air energy storage
Model test research on hydrodynamic grouting for single fracture with variable inclinations
A new method of laser convergence monitoring and its precision assessment
Local average method of triangular elements for discretization of random field of geotechnical parameters
Comprehensive risk analysis of TBM construction accident induced by tunnel deformations

Related Author

GE Xin-bo
HUANG Jun
ZHAO Tong-bin
TAO Gang
MA Hong-ling
WANG Wei
YU Wen-sheng
LI Peng

Related Institution

College of Energy and Mining Engineering, Shandong University of Science and Technology
China Energy New Energy Storage Technology (Shandong) Co., Ltd.
State Key Laboratory of Geomechanics and Geotechnical Engineering Safety, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
School of Civil Engineering and Architecture, Zhejiang Sci-Tech University
Research Center of Geotechnical and Structural Engineering, Shandong University
0