Breakage probability assessment of TBM construction tunnel lining segments considering geologic uncertainty
|更新时间:2026-06-25
|
Breakage probability assessment of TBM construction tunnel lining segments considering geologic uncertainty
Vol. 31, Issue 4, (2010)
作者机构:
1. 天津大学 建筑工程学院,天津,300072
2. 武汉广益工程咨询有限公司,武汉,430000
作者简介:
基金信息:
DOI:
CLC:
Online First:30 April 2010,
Published:2010
稿件说明:
移动端阅览
LIU Dong-hai, HUANG Pei-zhi, FENG Shou-zhong. Breakage probability assessment of TBM construction tunnel lining segments considering geologic uncertainty[J]. 2010, 31(4).
DOI:
LIU Dong-hai, HUANG Pei-zhi, FENG Shou-zhong. Breakage probability assessment of TBM construction tunnel lining segments considering geologic uncertainty[J]. 2010, 31(4).DOI:
Breakage probability assessment of TBM construction tunnel lining segments considering geologic uncertainty