Numerical analysis of surface settlement induced by shield tunnel construction of adjacent structure
|更新时间:2026-06-25
|
Numerical analysis of surface settlement induced by shield tunnel construction of adjacent structure
Vol. 30, Issue S2, (2009)
作者机构:
1. 浙江大学城市学院 土木工程系,杭州,310015
2. 浙江大学 建筑工程学院,杭州,310027
作者简介:
基金信息:
DOI:
CLC:TU443
Online First:21 June 2011,
Published:2009
稿件说明:
移动端阅览
DING Zhi, WEI Xin-Jiang, WEI Gang, et al. Numerical analysis of surface settlement induced by shield tunnel construction of adjacent structure[J]. 2009, 30(S2).
DOI:
DING Zhi, WEI Xin-Jiang, WEI Gang, et al. Numerical analysis of surface settlement induced by shield tunnel construction of adjacent structure[J]. 2009, 30(S2).DOI:
Numerical analysis of surface settlement induced by shield tunnel construction of adjacent structure
the construction of shield tunnel will influence the subsiding of adjacent building. In view of the structure’s different foundations
2D FEM is adopted to study and simulate the shield tunnel construction of adjacent structure. It is indicated as follows: the level distance from tunnel axis to building axis and different foundations are the important factors that influence surface settlement induced by shield tunnel construction; surface settlement is increased by the existence of building with tunnel excavation construction. Exceeding the ranges that surface settlement induced by shield tunnel construction