ZHAO Yong-guo, SHAO Sheng-jun, HAN Chang-ling. Simulation on different excavation construction of the shallow-buried tunnel under the uneven rock pressure[J]. 2009, 30(S2).
DOI:
ZHAO Yong-guo, SHAO Sheng-jun, HAN Chang-ling. Simulation on different excavation construction of the shallow-buried tunnel under the uneven rock pressure[J]. 2009, 30(S2).DOI:
Simulation on different excavation construction of the shallow-buried tunnel under the uneven rock pressure
In accordance with the instance of shallow-buried tunnel in a highway project
it was analyzed that numerical simulation on excavation construction of the entrance of the shallow-buried tunnel under the uneven rock pressure. Firstly
the computational models in FEM were built in differently excavating cases which were often adopted in practice. Then the stability and the different distribution of deformation and stresses of the rock and liner of tunnel were discussed in the two excavating case. In the end
according to the analysis and results the preference of effective measures of excavation is suggested. In sum
the improvement scheme and research redound to the effective control of the stability of shallow-buried tunnel under the uneven pressure from stratum during construction.