您当前的位置:
首页 >
文章列表页 >
Treatment and parameter selection of high slope of a power plant located in the terraces of Yellow River
更新时间:2026-06-25
    • Treatment and parameter selection of high slope of a power plant located in the terraces of Yellow River

    • Vol. 30, Issue S2, (2009)
    • CLC: TV223.1
    • Online First:21 June 2011,

      Published:2009

    移动端阅览

  • YAN Zhi-hua, LIU Zhi-wei, LIU Hou-jian. Treatment and parameter selection of high slope of a power plant located in the terraces of Yellow River[J]. 2009, 30(S2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

860

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of stress path and deformation-failure mechanism of high cutting loess slope
Anti-seismic stability analysis of entrance and high slope of water tunnel for a nuclear power plant
Discussion on frictional resistance problems and application experiment of yielding anchor cable in high slope support
Deformation monitoring and analysis of left bank high slope at Jinping I hydropower station
Study of creep constitutive model of silty mudstone under triaxial compression

Related Author

HOU Xiao-kun
LI Tong-lu
LI Ping
BAI Guang-bin
ZHAO Jie
YI Jian
WANG Bo
XU Jian-qiang

Related Institution

Key Laboratory for Geo-hazards in Loess Area of Ministry of Land and Resources, Xi’an Center of Geological Survey, China Geological Survey
School of Geological Engineering and Surveying, Chang’an University
Dalian University R&D Center of Civil Engineering Technology, Dalian University
Dalian Municipal Construction Engineering Labor Insurance Management Office
Institute of Civil Engineering, Dalian University of Technology
0