Research on rock burst estimation and control measures for auxiliary tunnels in Jinping Ⅱ hydropower station
|更新时间:2026-06-25
|
Research on rock burst estimation and control measures for auxiliary tunnels in Jinping Ⅱ hydropower station
Vol. 30, Issue S2, (2009)
作者机构:
1. 中国水电顾问集团 华东勘测设计研究院,杭州,310014
2. 中国科学院武汉岩土力学研究所 岩土力学与工程国家重点实验室,武汉,430071
作者简介:
基金信息:
DOI:
CLC:O341
Online First:21 June 2011,
Published:2009
稿件说明:
移动端阅览
ZHANG Qi-feng, ZHOU Chun-hong, ZHOU Hui, et al. Research on rock burst estimation and control measures for auxiliary tunnels in Jinping Ⅱ hydropower station[J]. 2009, 30(S2).
DOI:
ZHANG Qi-feng, ZHOU Chun-hong, ZHOU Hui, et al. Research on rock burst estimation and control measures for auxiliary tunnels in Jinping Ⅱ hydropower station[J]. 2009, 30(S2).DOI:
Research on rock burst estimation and control measures for auxiliary tunnels in Jinping Ⅱ hydropower station
Auxiliary tunnels of Jinping Ⅱ hydropower station are deeply buried. Rock burst under high geo-stress is one of the main problems to be taken into account. With the statistical data of the rock burst in the auxiliary tunnels and the in-situ stress and the mechanical properties of the rock
risk of rock burst in the auxiliary tunnels is analyzed by using different indexes. In addition
the prevention and cure methods of rock burst in the auxiliary tunnels are discussed. The results can provide basic support for rock burst estimation and prevention in the process of construction of four diversion tunnels in Jinping Ⅱ hydropower station.