您当前的位置:
首页 >
文章列表页 >
Research on rock burst estimation and control measures for auxiliary tunnels in Jinping Ⅱ hydropower station
更新时间:2026-06-25
    • Research on rock burst estimation and control measures for auxiliary tunnels in Jinping Ⅱ hydropower station

    • Vol. 30, Issue S2, (2009)
    • CLC: O341
    • Online First:21 June 2011,

      Published:2009

    移动端阅览

  • ZHANG Qi-feng, ZHOU Chun-hong, ZHOU Hui, et al. Research on rock burst estimation and control measures for auxiliary tunnels in Jinping Ⅱ hydropower station[J]. 2009, 30(S2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1339

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on floor heave characteristics of broken soft rocks with high geostress and its comprehensive control measures
Roof deformation mechanism and control measures of pillarless mining with gob-side entry retaining by roof cutting and pressure relief
Optimal design of lining structure in artificial cavern of compressed air energy storage
Mechanical properties and microstructural evolution of peaty soils subjected to freeze-thaw cycles
Experimental study on the definition and evolution characteristics of unfrozen water retention states in frozen clay

Related Author

LIU Quan-sheng
XIAO Hu
LU Xing-li
CUI Wen-tai
YANG Jun
WEI Qing-long
WANG Ya-jun
GAO Yu-bing

Related Institution

College of Civil Engineering and Architecture, Shandong University of Science and Technology
State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining & Technology(Beijing)
School of Mechanics and Civil Engineering, China University of Mining & Technology(Beijing)
Department of Geotechnical Engineering, Tongji University
0