您当前的位置:
首页 >
文章列表页 >
Preliminary study of typical fault diagnosis in shield tunneling
更新时间:2026-06-25
    • Preliminary study of typical fault diagnosis in shield tunneling

    • Vol. 30, Issue S2, (2009)
    • CLC: U451
    • Online First:21 June 2011,

      Published:2009

    移动端阅览

  • LI Xing-gao, YUAN Da-jun, YANG Quan-liang. Preliminary study of typical fault diagnosis in shield tunneling[J]. 2009, 30(S2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1243

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study of longitudinal mechanical behavior and countermeasure for neighborhood overlapped shield tunneling
Numerical analysis of shield tunneling construction through adjacent objects
Simulation test study of deformations of pipelines located at different geometric positions arising from shield tunneling
Anti-erosion mechanisms of microbially induced calcium carbonate precipitation-vegetation synergistic slope protection
Evaluation of liquefaction flow characteristics and soil state of saturated sand based on tension and compression apparent viscosity

Related Author

ZHANG Hui-jian
QIU Wen-ge
FENG Ji-meng
ZHENG Yu-chao
GONG Lun
LIAO Shao-ming1
YU Yan2
PENG Fang-le1

Related Institution

School of Civil Engineering, Southwest Jiaotong University
Geotechnical Engineering Department, Tongji University
Shanghai Seakon Ground Engineering Research and Consulting Center
同济大学 地下建筑与工程系
0