High-speed railway bridge settlement conformity is a major measure to ensure the high-speed railway construction quality. Through accumulating the observed data of settlements of a large number of high-speed railway bridges
and then analyzing the process of settlements of soft soil by using curve fitting the settlement deformation laws which is practical application value
the development of settlement law can be predicted. In order to predict the whole process of bridge base settlements and make carve fitting
through a variety of theoretical calculations and a large amount of the settlement analysis of observed data statistical induction
the following index of the deformation process method is proposed first. The results have been applied to the Beijing-Shanghai High-speed Railway and other related projects to predict their foundations’ settlements