您当前的位置:
首页 >
文章列表页 >
Research on differential settlement index of high-filled subgrade after construction in mountainous airport
更新时间:2026-06-25
    • Research on differential settlement index of high-filled subgrade after construction in mountainous airport

    • Vol. 30, Issue 12, (2009)
    • CLC: TU457
    • Online First:18 January 2010,

      Published:2009

    移动端阅览

  • GU Qiang-kang, LI Ning, HUANG Wen-guang. Research on differential settlement index of high-filled subgrade after construction in mountainous airport[J]. 2009, 30(12). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

3156

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Seismic dynamic response analysis of breakwater under traveling wave excitations
Numerical analysis of piled beam-raft foundation of third-phrase project of Guohua Tongliao wind farms
Study of support optimization of large underground cavern group excavation using elastoplastic damage finite elements
Simulation of construction process of deep foundation pit in complex environment
Mechanism analysis of earthquake responses of rigid pile composite foundation

Related Author

JIN Xian-long
YU Ke-qin
WANG Huan-huan
YANG Xun
LI Da-jun
HUANG Mao-song
MU Lin-long
LIAN Ke-nan

Related Institution

上海交通大学 机械系统与振动国家重点实验室
上海交通大学 机械与动力工程学院
上海核工程研究设计院
KeyTU 473 Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University
Department of Geotechnical Engineering, Tongji University
0