您当前的位置:
首页 >
文章列表页 >
Analysis of blasting vibration response of parallel set small clear-distance tunnels and blasting control measures
更新时间:2026-06-25
    • Analysis of blasting vibration response of parallel set small clear-distance tunnels and blasting control measures

    • Vol. 30, Issue 9, (2009)
    • CLC: O389
    • Online First:24 March 2010,

      Published:2009

    移动端阅览

  • YAO Yong, HE Chuan. Analysis of blasting vibration response of parallel set small clear-distance tunnels and blasting control measures[J]. 2009, 30(9). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2625

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study of blasting vibration control technology of up and down cross tunnel
Study of blasting vibration and deformation control for metro construction beneath existing metro tunnel in short distance
Characteristic study of surrounding rock mass deformation considering accumulative damage effect
Analysis of supporting effect of systematic bolts applied to weak and broken phyllite tunnels in meizoseismal area
Study of site monitoring of vertical full displacement of vault surrounding rock of tunnels and its change law

Related Author

YU Jian-xin
CHEN Wei-zhong
YANG Jian-ping
YANG Fan
LI Ming
匡岳林
戴永浩
LI Shu-cai

Related Institution

State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences
Research Center of Geotechnical and Structural Engineering, Shandong University
Dongguan Express Development Ltd. Co.
Research Center of Geotechnical & Structural Engineering, Shandong University
Beijing Urban Construction Design & Development Group Company Limited
0