Experimental research on clogging of mat base of inside and outside liner of Yellow River-crossing tunnel by concrete construction
|更新时间:2026-06-25
|
Experimental research on clogging of mat base of inside and outside liner of Yellow River-crossing tunnel by concrete construction
Vol. 30, Issue 10, (2009)
作者机构:
长江科学院 水利部岩土力学与工程重点实验室,武汉,430010
作者简介:
基金信息:
DOI:
CLC:U451
Online First:23 December 2009,
Published:2009
稿件说明:
移动端阅览
DING Pei-zhong, ZHOU Mi, ZHANG Wei. Experimental research on clogging of mat base of inside and outside liner of Yellow River-crossing tunnel by concrete construction[J]. 2009, 30(10).
DOI:
DING Pei-zhong, ZHOU Mi, ZHANG Wei. Experimental research on clogging of mat base of inside and outside liner of Yellow River-crossing tunnel by concrete construction[J]. 2009, 30(10).DOI:
Experimental research on clogging of mat base of inside and outside liner of Yellow River-crossing tunnel by concrete construction