您当前的位置:
首页 >
文章列表页 >
Experimental research on clogging of mat base of inside and outside liner of Yellow River-crossing tunnel by concrete construction
更新时间:2026-06-25
    • Experimental research on clogging of mat base of inside and outside liner of Yellow River-crossing tunnel by concrete construction

    • Vol. 30, Issue 10, (2009)
    • CLC: U451
    • Online First:23 December 2009,

      Published:2009

    移动端阅览

  • DING Pei-zhong, ZHOU Mi, ZHANG Wei. Experimental research on clogging of mat base of inside and outside liner of Yellow River-crossing tunnel by concrete construction[J]. 2009, 30(10). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2584

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of maximum liquid depth in landfill drainage layers under clogging conditions
Scattering around a liner of arbitrary shape in saturated soil under dilatational waves
Experiments on pipe and filter structures of relief well in Dongting Lake region
Test study on filtration mechanism of silt-net system under limit soil-retained state
Calculation on the settlement of dredged slurry treated by vacuum preloading method with consideration of clogging effects

Related Author

CHEN Yun-min
WAN Xiao-li
LI Yu-chao
KE Han
GU Gao-li
YU Zhong-jiu
CHEN Shan-xiong
JIANG Ling-fa

Related Institution

MOE Key Laboratory of Soft Soils and Geoenvironmental Engineering, Zhejiang University
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
Xinhe Coal Mine
College of Water Conservancy and Hydropower Engineering, Hohai University
China Water Investment Corporation
0