您当前的位置:
首页 >
文章列表页 >
Regression analysis of 3D initial geostress in region of underground powerhouse for large hydropower station
更新时间:2026-06-25
    • Regression analysis of 3D initial geostress in region of underground powerhouse for large hydropower station

    • Vol. 30, Issue 8, (2009)
    • CLC: TV223
    • Online First:14 March 2011,

      Published:2009

    移动端阅览

  • XIE Hong-qiang, HE Jiang-da, XIAO Ming-li. Regression analysis of 3D initial geostress in region of underground powerhouse for large hydropower station[J]. 2009, 30(8). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

3324

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Dynamic response of pile foundation under horizontal resonant vibratory loads
Genesis mechanism and engineering characteristics analysis of G23 mylonitization and fractured belt in dam foundation of a hydropower station
Study on ?-SVR and modified GA in back analysis of initial stress fields from displacements
Nonliner Finite Element Method (Part 1)
非线性有限单元法

Related Author

CAI Ke-jian
YAN Xin-chun
LIU Jin-tang
YANG Sheng-qi
XU Wei-ya
MENG Guo-tao
LI Jun-ping
CHEN Yi-feng

Related Institution

School of Civil Engineering, Ningbo University of Technology
Research Institute of Geotechnical Engineering, Hohai University
Kunming Hydroelectric Investigation, Design and Research Institute, China Hydropower Engineering Consulting Group Co.
Jinghong Hydropower Project Construction & Management Bureau
State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University
0