您当前的位置:
首页 >
文章列表页 >
Study of deformation response of a high rock slope excavation at an intake for a large hydropower station
更新时间:2026-06-25
    • Study of deformation response of a high rock slope excavation at an intake for a large hydropower station

    • Vol. 31, Issue 2, (2010)
    • CLC: TU457
    • Online First:24 March 2010,

      Published:2010

    移动端阅览

  • ZHU Ji-liang, HUANG Run-qiu, ZHANG Shi-yuan, et al. Study of deformation response of a high rock slope excavation at an intake for a large hydropower station[J]. 2010, 31(2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2375

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of stress path and deformation-failure mechanism of high cutting loess slope
Anti-seismic stability analysis of entrance and high slope of water tunnel for a nuclear power plant
Influence of excavation unloading on vertical bearing behavior of existing pile groups
Discussion on frictional resistance problems and application experiment of yielding anchor cable in high slope support
PFC3D numerical experiments of self-boring in-situ shear pressuremeter model test under different consolidation pressures

Related Author

HOU Xiao-kun
LI Tong-lu
LI Ping
BAI Guang-bin
ZHAO Jie
YI Jian
WU Cheng-jie
YU Feng

Related Institution

School of Geological Engineering and Surveying, Chang’an University
Key Laboratory for Geo-hazards in Loess Area of Ministry of Land and Resources, Xi’an Center of Geological Survey, China Geological Survey
Institute of Civil Engineering, Dalian University of Technology
Dalian Municipal Construction Engineering Labor Insurance Management Office
Dalian University R&D Center of Civil Engineering Technology, Dalian University
0