您当前的位置:
首页 >
文章列表页 >
Back analysis of three-dimensional initial geostress Laxiwa underground powerhouse
更新时间:2026-06-25
    • Back analysis of three-dimensional initial geostress Laxiwa underground powerhouse

    • Vol. 31, Issue 1, (2010)
    • CLC: TU443
    • Online First:02 February 2010,

      Published:2010

    移动端阅览

  • YAO Xian-chun, LI Ning, QU Xing, et al. Back analysis of three-dimensional initial geostress Laxiwa underground powerhouse[J]. 2010, 31(1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2729

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Back analysis of initial geostress field of dam site in west route of South-to-North water transfer project
Simulation of opening displacement of brittle rockmass at point of energy dissipation
Estimation of in situ geostress states from measuring shape of disked core
Settlement calculation of pile foundation in deep-soft soil considering depth effect of compression modulus
Research on floor heave characteristics of broken soft rocks with high geostress and its comprehensive control measures

Related Author

PEI Qi-tao
LI Hai-bo
LIU Ya-qun
ZHENG Wen-hua
ZHU Wei-shen
LIU De-jun
LI Yan-heng
TAN Ke-ke

Related Institution

State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
Department of Geotechnical Engineering, Tongji University
Geotechnical and Structural Engineering Research Center,Shandong University
State Key Laboratory of Building Safety and Built Environment, China Academy of Building Research
Engineering Design & Research Institute of The Second Artillery Corps
0