Field shearing test for heavily weathered hornstone of Three Phase Project of Ling'ao Nuclear Power Station
|更新时间:2026-06-25
|
Field shearing test for heavily weathered hornstone of Three Phase Project of Ling'ao Nuclear Power Station
Vol. 30, Issue 12, (2009)
作者机构:
1. 中国科学院武汉岩土力学研究所 岩土力学与工程国家重点试验室,武汉,430071
2. 广东省电力设计研究院,广州,510663
作者简介:
基金信息:
DOI:
CLC:TU458
Online First:18 January 2010,
Published:2009
稿件说明:
移动端阅览
LU Zu-de, CHEN Cong-xin, CHEN Jian-sheng, et al. Field shearing test for heavily weathered hornstone of Three Phase Project of Ling'ao Nuclear Power Station[J]. 2009, 30(12).
DOI:
LU Zu-de, CHEN Cong-xin, CHEN Jian-sheng, et al. Field shearing test for heavily weathered hornstone of Three Phase Project of Ling'ao Nuclear Power Station[J]. 2009, 30(12).DOI:
Field shearing test for heavily weathered hornstone of Three Phase Project of Ling'ao Nuclear Power Station