您当前的位置:
首页 >
文章列表页 >
Practice and monitoring analysis of building lifting due to grouting
更新时间:2026-06-25
    • Practice and monitoring analysis of building lifting due to grouting

    • Vol. 30, Issue 12, (2009)
    • CLC: TU753.8
    • Online First:18 January 2010,

      Published:2009

    移动端阅览

  • YI Xiao-ming, ZHANG Ding-li, PANG Tie-zheng, et al. Practice and monitoring analysis of building lifting due to grouting[J]. 2009, 30(12). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

3593

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Forecasting model of slope stability considering deformation mechanism
Construction monitoring for Xiakou soft rock tunnel under high geostress and its supporting measures
Monitoring analysis of retaining structures for Jiangnan foundation pit of Qingchun road river-crossing tunnel in Hangzhou
Numerical modeling of water flow and heat transfer in a meter-scale physical model of fractured rocks
Numerical simulation for appropriate lining time of tunnel considering rock mass rheological conditions

Related Author

LI Cong
JIANG Qing-hui
ZHOU Chuang-bing
QI Zu-fang
LI Hong-bo
DAI Yong-hao
Song Ji-hong
FU Ke-jian

Related Institution

School of Civil and Architectural Engineering, Wuhan University
Key Laboratory of Geotechnical Mechanics and Engineering of Ministry of Water Resources, Yangtze River Scientific Research Institute
State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University
College of Civil Engineering & Mechanics, Huazhong University of Science and Technology
Second Highway Consultants Co., Ltd., China Communications Construction Corporation
0