您当前的位置:
首页 >
文章列表页 >
Research on calculation method of soil 3D displacement due to shield tunnel construction
更新时间:2026-06-25
    • Research on calculation method of soil 3D displacement due to shield tunnel construction

    • Vol. 30, Issue 8, (2009)
    • CLC: TU433
    • Online First:14 March 2011,

      Published:2009

    移动端阅览

  • QI Jing-jing, XU Ri-qing, WEI Gang. Research on calculation method of soil 3D displacement due to shield tunnel construction[J]. 2009, 30(8). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2466

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Dynamic analysis of strata horizontal displacements induced by shield construction of deep tunnel
Prediction of surface settlement induced by double-o-tube shield tunnel excavation
Spatiotemporal model of ground deformation caused by groundwater gathering based on stochastic medium theory
Research on superposition method of interaction between soil frost heave and beams on foundation
Calculation and analysis of construction mechanics effect due to tunnel construction by shield

Related Author

YIN Jia-shun
YUAN Jie
LI Lin
JIANG Xin-liang
WEI Xin-jiang
CHEN Wei-jun
WEI Gang
YIN Zhi-zheng

Related Institution

School of Civil Engineering, Tianjin University
Institute of Geotechnical Engineering, Zhejiang University
City College Zhejiang University
江苏大学 理学院
中南大学 土木建筑学院
0