您当前的位置:
首页 >
文章列表页 >
An analytical solution for displacement and stress caused by shallow buried tunnel excavation under existing highway foundation
更新时间:2026-06-25
    • An analytical solution for displacement and stress caused by shallow buried tunnel excavation under existing highway foundation

    • Vol. 31, Issue 2, (2010)
    • CLC: U451
    • Online First:24 March 2010,

      Published:2010

    移动端阅览

  • AI Chuan-zhi, WANG Zhi-yin. An analytical solution for displacement and stress caused by shallow buried tunnel excavation under existing highway foundation[J]. 2010, 31(2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

3177

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of one-dimensional consolidation characteristics in unsaturated soils
Composite ground settlement calculating method with displacement non-compatibility between deep mixing columns and surrounding soil
Settlement calculation of new prestressed pipe-pile with rib based on Geddes’ formula
Capillary effect of moisture transfer and its numerical simulation of compacted laterite soil
Analytical solution for settlement of group piles in layered ground based on shear displacement method

Related Author

QIN Ai-fang
Qiang –rui
TAN Yong-wei
SUN De-an
ZHENG Xiao-guo
ZHANG Ding-wen
XIE Wei
JIANG Yuan-hai

Related Institution

Department of Civil Engineering, Shanghai University
Department of Geotechnical Engineering, Tongji University
Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University
School of Road and Bridge, Zhejiang Institute of Communications
School of Transportation, Southeast University
0