Study of time-space united calculating method of stratum deformation caused by shield tunnel excavation
|更新时间:2026-06-25
|
Study of time-space united calculating method of stratum deformation caused by shield tunnel excavation
Vol. 30, Issue 8, (2009)
作者机构:
中南大学 土木建筑学院,长沙,410075
作者简介:
基金信息:
DOI:
CLC:U451
Online First:14 March 2011,
Published:2009
稿件说明:
移动端阅览
SHI Cheng-hua, PENG Li-min, LEI Ming-feng. Study of time-space united calculating method of stratum deformation caused by shield tunnel excavation[J]. 2009, 30(8).
DOI:
SHI Cheng-hua, PENG Li-min, LEI Ming-feng. Study of time-space united calculating method of stratum deformation caused by shield tunnel excavation[J]. 2009, 30(8).DOI:
Study of time-space united calculating method of stratum deformation caused by shield tunnel excavation