您当前的位置:
首页 >
文章列表页 >
白鹤滩水电站初始地应力场研究分析
更新时间:2026-06-25
    • 白鹤滩水电站初始地应力场研究分析

    • Vol. 31, Issue 3, (2010)
    • CLC: O319.56
    • Online First:31 March 2010,

      Published:2010

    移动端阅览

  • JIN Chang-yu, FENG Xia-ting, ZHANG Chun-sheng. 白鹤滩水电站初始地应力场研究分析[J]. 2010, 31(3). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

4255

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Back analysis of dynamic parameters of dam materials based on earth-rockfill dam dynamic characteristics
Mechanical behavior of sandstone and its neural network simulation of constitutive model considering cyclic drying-wetting effect
Characteristics of surrounding rock pressure of deep tunnel in segment of geological structure development
Back analysis of displacements of Heihe clay core rockfill dam at different stages
Back analysis of tectonic stress tensor based on the formula for calculating pitch direction of fault slip data

Related Author

LIU Zhen-ping
CHI Shi-chun
REN Xian-yong
LI Ke-gang
ZHENG Dong-pu
HUANG Wei-hui
LIU Cheng-yu
HE Man-chao

Related Institution

Quality Monitoring Station of Shandong Province Communications Department
College of Civil and Architecture Engineering, Heilongjiang Institute of Technology
School of Hydraulic Engineering, Dalian University of Technology
Xingtai Construct Engineering Quality Testing Center
State Key Laboratory of Coal Mine Disaster Dynamics and Control, Chongqing University
0