您当前的位置:
首页 >
文章列表页 >
Multi-parameter monitoring of frozen soil structure with super-long freezing hole drilling in Guangzhou metro
更新时间:2026-06-25
    • Multi-parameter monitoring of frozen soil structure with super-long freezing hole drilling in Guangzhou metro

    • Vol. 31, Issue 1, (2010)
    • CLC: TU472.9
    • Online First:02 February 2010,

      Published:2010

    移动端阅览

  • JIANG Yao-dong, ZHAO Yi-xin, ZHOU Gang, et al. Multi-parameter monitoring of frozen soil structure with super-long freezing hole drilling in Guangzhou metro[J]. 2010, 31(1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

3433

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Surveying hidden dangers in soil above vault lining of metro
Comparative study of elastic design theories of circular frozen wall of shaft
Experimental study of anti-frost-heave and frost boil effect of block-stone-interlayer embankment in permafrost regions
Structural and waterproof design of Xi’an Metro Line No.2 crossing earth crevasse
Experimental study of electrical resistivity and deformation characteristics of saturated silty clay during repeated freeze-thaw cycles

Related Author

ZHONG Shi-hang
LIU Chuan-xin
FAN peng-ju
WANG Rong
WANG Ze-feng
ZHOU Xiao-min
GUAN Hua-dong
LUO Xiao-qing

Related Institution

Jiangsu Transportation Institute, Co., Ltd.
H.E.M.E New-Tech Development Co., Ltd., Beijing
China Academy of Railway Sciences
Beijing Huayu Engineering Limit Corporalion, Sino-Coal International Engineering Group
State Key Laboratory of High-Efficient Mining and Safety of Metal Mines of Ministry of Education, University of Science and Technology Beijing
0