您当前的位置:
首页 >
文章列表页 >
Researches on pull-out capacity calculating method of rock bolt foundation
更新时间:2026-06-25
    • Researches on pull-out capacity calculating method of rock bolt foundation

    • Vol. 30, Issue S1, (2009)
    • CLC: TU443
    • Online First:16 March 2011,

      Published:2009

    移动端阅览

  • SUN Chang-shuai, YANG Hai-wei, XU Guang-li. Researches on pull-out capacity calculating method of rock bolt foundation[J]. 2009, 30(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

3737

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of pull-out capacity of plate anchor using upper bound limit method
Evaluation of earth pressure at active side for anisotropic sand
Study of improvement of secondary consolidation settlement calculation method
Mechanical mechanism and calculation method of bit expanded anchor rods
Research on calculation metheods of earth pressure on muti-arch tunnel for highway

Related Author

HUANG Mao-song
YU Sheng-bing
ZHANG Jian-min
SONG Fei
FENG Hao-jie
ZHU Jun-gao
FENG Zhi-gang
ZENG Qing-yi

Related Institution

Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University
Department of Geotechnical Engineering, Tongji University
State Key Laboratory of Hydroscience and Engineering, Tsinghua University
School of Highway, Chang’an University
Geotechnical Research Institute, Hohai University
0