您当前的位置:
首页 >
文章列表页 >
Dewatering design and monitoring of building foundation pit nearby Qiantang River
更新时间:2026-06-25
    • Dewatering design and monitoring of building foundation pit nearby Qiantang River

    • Vol. 29, Issue S1, (2008)
    • CLC: TU473
    • Online First:15 April 2016,

      Published:2008

    移动端阅览

  • XIA Jian-zhong, LUO Zhan-you, GONG Xiao-nan. Dewatering design and monitoring of building foundation pit nearby Qiantang River[J]. 2008, 29(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

724

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on relations between bank stability of a reservoir and variations of groundwater level
Monitoring horizontal displacements of support structure for a complicated planar foundation pit and its reinforcement
Experimental study of basal heave failure mode of narrow-deep foundation pit in soft clay
Study of time effect on top-down excavation of Shanghai Zhongshan Hospital
Analysis of damage causes of a metro station passageway

Related Author

JIANG Chen-guang
LI Shao-hong
HE Yong
ZHANG Qing-feng
JIANG Yong
XIONG Zhi-biao
WANG Qi-yun
ZHANG Fei

Related Institution

School of Environmental and Civil Engineering, Jiangnan University,,.
Qingdao Agricultural University
College of Urban Construction, South China University
School of Civil Engineering, Yancheng Institute of Technology
Department of Geotechnical Engineering, Tongji University
0