您当前的位置:
首页 >
文章列表页 >
Study of optimal design of the Shitanba slope at Hu-Rong West expressway
更新时间:2026-06-25
    • Study of optimal design of the Shitanba slope at Hu-Rong West expressway

    • Vol. 29, Issue S1, (2008)
    • CLC: TU443
    • Online First:15 April 2016,

      Published:2008

    移动端阅览

  • LI Jing, LI Yu-lei, YAN E-chuan. Study of optimal design of the Shitanba slope at Hu-Rong West expressway[J]. 2008, 29(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

802

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Research on formation mechanism and stability of tensile cracking-sliding loess collapse
Determination of engineering parameters based on mutable characteristics of monitored values in numerical simulation
Stability analysis of high rock slope based on meticulous description of complex structure
Critical span calculation of stope roof with waste-lifting stoping method
Analytic approach of slope multi-slip surfaces based on local strength reduction method and its application

Related Author

YE Wan-jun
YANG Geng-she
ZHANG Hui-mei
SHEN Yan-jun
LI Xiao
LIANG Bo
HUANG Gang-hai
DU Peng-zhao

Related Institution

College of Architecture and Civil Engineering, Xi'an University of Science & Technology
Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
Sui-Yue Expressway Construction Manayement Office of Province
Tianxing Iron Mine, Hebei Iron Steel Group Mining Co. Ltd.
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
0