Remote monitoring system applied to the construction of metro station undercrossing existing metro tunnel
|更新时间:2026-06-25
|
Remote monitoring system applied to the construction of metro station undercrossing existing metro tunnel
Vol. 30, Issue 6, (2009)
作者机构:
北京交通大学 隧道及地下工程教育部工程研究中心,北京,100044
作者简介:
基金信息:
DOI:
CLC:U456.3
Online First:09 March 2011,
Published:2009
稿件说明:
移动端阅览
ZHANG Cheng-ping, ZHANG Ding-li, LUO Jian-jun, et al. Remote monitoring system applied to the construction of metro station undercrossing existing metro tunnel[J]. 2009, 30(6).
DOI:
ZHANG Cheng-ping, ZHANG Ding-li, LUO Jian-jun, et al. Remote monitoring system applied to the construction of metro station undercrossing existing metro tunnel[J]. 2009, 30(6).DOI:
Remote monitoring system applied to the construction of metro station undercrossing existing metro tunnel
Development of real-time remote monitoring and forecasting system for geological disasters at subgrade slopes of mountainous highways and its application
Experimental study on shear characteristics of mudstone under combined action of stress-dry-wet cycles
Nonlinear mechanical response of surrounding rock in compressed air energy storage cavern based on Hoek-Brown criterion
Hydraulic scouring resistance characteristics of geosynthetics reinforced slopes
Optimal design of lining structure in artificial cavern of compressed air energy storage
Related Author
WU Kai
SHENG Qian
ZHANG Yong-hui
LI Zhi-yong
LI Hong-xu
YUE Zhi-ping
Related Institution
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences